Hockley Road, Rayleigh

We are upgrading the gas pipes along Bristol Gardens to ensure you continue to receive a reliable gas supply for many more years to come. Our aim is to replace all the metallic mains and service pipes in these locations. This means that we will need to excavate holes in the ground to access the gas pipes in order to inspect and replace them.
 
We anticipate the project duration to be 10 weeks. If any changes are required, we will keep you informed.
Due to the nature of the work involved, we have planned to deliver it in a number of phases to maximise efficiency and minimise disruption.

 Starting 24 July 2023 for ten weeks
 
Phase 1: two weeks
The first phase will begin at the roundabout with Hambro Hill. 80m of the existing gas pipe will be replaced.
 
Phase 2: two weeks
Continuing along High Road, a further 150m of the existing gas pipe will be replaced.
 
Phase 3: two weeks
125m of the existing gas pipe will be replaced.
 
Phase 4: two weeks
110m of the existing gas pipe will be replaced.
 During this phase the bus stop by The Gattens will be suspended and used for storage.
 
Phase 5: two weeks
115m of the existing gas pipe will be replaced.
 

Contact us

For support or further information, please call us:

   0345 835 1111