An independent gas transporter (IGT) or utility infrastructure provider (UIP) can submit a fast track request when the requirement of the site falls within the scope of the standard pressure matrix available in TSPNP14e appendices (please see supporting documents).

This process can also be used when the IGT or UIP has received a valid land enquiry response whereby reinforcement has not been identified.

The only exception to this process is that if the site contains a compressor, CHP or booster the full quotation request process must be followed.

Fast-track Standard Administration Charges (excluding VAT)

Customer type Manual Portal Portal and pre-authorisation
IGT £120 £107 £72
UIP (<63mm diameter) £143 £130 £95
UIP (≥63mm diameter) £163 £150 £115

Terms and Conditions

General conditions of contract for:

General Conditions of Contract for self lay systems below 2196000KWH February 2017

Easements

Sometimes when IGTs/UIPs want to connect to our network an easement may be required before work can begin.

Standard UIP Easement

Forms

 FM138A Request
 FM140 GT UIP Quotation Variation Self Connection Notification Form
FM144 SDN
FM153a GT Fast Track Self Quotation Acceptance Form
FM176 Request for Medium Pressure Tier Information
TSPNP14e
Design variation request form

Policy

Specification for the design of system extensions,connections and services to below 7 bar Cadent systems

TSPNP14e

Mains location

Additional mains location guidance is provided in briefing note 11.

UIP-GT Briefing Note 11 PJG

Contact us

Lead time for submissions is D+5.

  • Email us, or call:
  • 08453 666 758 (option 3)

Calls will cost 7p per minute plus your providers connection charge.

For escalations please contact: Laura Cheshire or Jemima Mitchell.

If you have any enquiries relating to the validation and data capture of completion files please contact us.