Forms



 

Request Forms:

UIP Registration Form
FM153 GT Quotation Request
FM153a GT Fast Track Submission
FM172 GT Land Enquiry
FM138 UIP Quotation Request
FM138a UIP Fast Track Submission
FM137 UIP Land Enquiry
FM176 Medium Pressure Tier Request
FM144 Start Date Notification (SDN) Request
Peak / Off Peak Analysis Forms (C1 & C2)
DAS Application Form

Charges & Terms & Conditions:

Connections charging statement from 01 April 2023
Notification of Change – Standard Connections Charges Effective 01 April 23
Notification of Change – CPI(h) 23_24 Cadent Connections Services April 23
Notification of Change – NPV transportation April 2023
General Conditions of Contract for self lay systems above 2196000KWH February 2017
General Conditions of Contract for self lay systems below 2196000KWH February 2017
General Conditions of Contract for Site Engineering Works for Connected Offtake Systems

Fast-track Standard Administration Charges (excluding VAT)

Customer type Manual Portal Portal and pre-authorisation
IGT £138 £123 £84
UIP (<63mm diameter) £165 £150 £110
UIP (≥63mm diameter) £188 £173 £133
 

Quotation Standard Administration Charges (excluding VAT)

Customer type Manual Portal
IGT £274 £258
UIP (<63mm diameter) £306 £289
UIP (≥63mm diameter) £326 £309

 

Other Forms / Documents:

Cadent’s position on single-service CSEPs
Easement Guidance
UIP_Precedent_Easement
Guidance for organisations constructing and connecting assets to the Cadent Gas distribution network
UIP Guidance Note
Design Variation Form
iGT / UIP Portal Quick Reference Guide
DAS Brochure
Completions Checklist
Easement - Frequently Asked Questions
 

Briefing Notes:

Whereabouts Briefing Note
Whereabouts Template
Network Exit Agreements - Briefing note for end consumers
Network Exit Agreements - Briefing note for IGTs and UIPs
11 Mains Location Process
16 Design Pre Authorisation Process
17 Competitive Quotation Form
20 iGT / UIP Web Portal
Heat Recovery Briefing Note
Heat Recovery Briefing Q&A
Pressure Testing Briefing Note
Pressure Test Briefing Q&A    

Policies & Engineering Bulletins:

EB Purge vent pipes
EB PRI welding clarification
EB Branch saddles
PE Branch saddles
EB Vehicle impact protection


Supplementary Specification for GIS/E34 - CAD/SP/E/34 January 2021
Specification for the design of system extensions,connections and services to below 7 bar Cadent systems- TSPNP14e

iGT & UIP Reference Group:

Every 3 months Cadent hold a reference group meeting for their IGT & UIP customers at our Hinckley office. Please email us for more information or request to be added to the reoccurring invitation.

Contact us

We want to hear from you and work with you. Call 08453 666 758 to speak to a specific member of the team select option 1 and dial the extension number. IGT/UIP Connections: Option 3.

For all email correspondence please contact networkdesign@cadentgas.com.

Contract, consultation or registration queries and all other correspondence can be sent to: networkdesign@cadentgas.com

or call 08453 666 758